AIAL Operations Control Centre

Client: Accent Construction & AIAL
Date: 2023
Location: Auckland Airport

Project overview

GVC was engaged by Accent Construction and Interiors to deliver structured cabling and digital infrastructure for Auckland Airport’s new Operations Control Centre. Located within the international terminal, the project required work in a live environment, demanding precise coordination and adherence to aviation security protocols.

GVC’s involvement

  • Built a high-performance server room and installed structured cabling across operational areas
  • Delivered digital infrastructure including 27 videowall panels, ultra-wide monitors, VoIP phones and wireless access
  • Worked directly with AIAL’s Business Technologies team to integrate diverse network links for AIAL, NZTA, and emergency services

Performance commentary

  • Quality: Delivered to spec with no post-install issues
  • Time: On programme despite operating in a live terminal
  • Cost: Delivered within budget
  • H&S: Strict compliance with aviation safety standards

Conclusion

The project bolstered Auckland Airport’s operational resilience with a future-ready control centre. GVC’s ability to deliver in a secure, live environment highlights its strength in critical infrastructure and multi-stakeholder coordination